fault materials...6 RAD materials are loaded1. 2. Downloading OpenStudioMasterTemplate.idf to c:\ladybug\3. Loading EP construction library4. 206 material found in c:\ladybug\OpenStudioMasterTemplate.idf5. 30 windowmaterial found in c:\ladybug\OpenStudioMasterTemplate.idf6. 284 construction found in c:\ladybug\OpenStudioMasterTemplate.idf7. Loading EP schedules...8. The ScheduleTypeLimits: Fraction is already existed in the libaray.You need to rename this ScheduleTypeLimits.9. The ScheduleTypeLimits: Temperature 7 is already existed in the libaray.You need to rename this ScheduleTypeLimits.10. 21 scheduletypelimits found in c:\ladybug\OpenStudioMasterTemplate.idf11. 1370 schedule found in c:\ladybug\OpenStudioMasterTemplate.idf12. 13. 14. Hooohooho...Flying!!Vviiiiiiizzz...…
vector * number
8. number * point
9. point * number
10. complex * complex
11. colour * colour
12. colour * number
13. number * colour
--
David Rutten
david@mcneel.com
Seattle, WA…
Added by David Rutten at 10:39pm on November 12, 2010
an't remember it) that will only give you the resulting whole number that results from any given division...modulus division will give the exact opposite, or only the fractions of numbers that result. In code they would be forward slash, back slash, and percent symbol, respectively. That's the case for VB and most other languages as well...here's a simple example...
8/3 = 2.66666
8\3 = 2
8%3 = 0.6666
HTH…
en 3 of them, and one poolyline between two of them.
It would also be very nice if i could control it so that only the successive ones can be connected
so if {0:0:0} has 8 points and {0:0:1} has 8, as do {0:0:5} and {0:0:6} i would like to have this as two polylines, not one continoous that would in this case jump three branches (or curves that are shorter).
Does this make any sense?…
Added by Dusan Bosnjak at 2:08pm on September 28, 2009
he sunPath component works. For example if you want to simulate the hours from 8 to 16 it means you want 8 hours from 8 to 9, from 9 to 10,.... from 15 to 16 (8 hours duration period) so you get from the sunPath component (using default timeStep 1) the 9 sun position/vectors 8 9 10 11 12 13 14 15 16 (in the image the yellow suns). The things is that if you ask for a smaller timeStep for example 3 = 20 mins then the additional sun position (in the image the orange suns) are added also after the time limit of h16 so probably when you don't want/need. I understand that when you input a time period there is the ambiguity if the hours are the just 9 (the 9 inputs) or the 8 hours included between pairs of hours, but I would make in a way that it is possible to chose if the extra timeStep after the last hour are added or not. Thank you for your comments.
…
he same order of the list. for example i have a list with 4 different lenght of curve like this:
0= 10
1= 12
2= 8 (minimum)
3= 17 (maximum)
and wont to make a ranking that the longest curve gets the value 4 and the smallest the value 1, like this
0= 2
1= 3
2= 1
3= 4
i tried the sort list function, but it dosn`t work
can anybody help me!
thx a lot…