al means. Also according to the double meanings that Caterpillar has in english, the bracelet recalls colors of the nature.Caterpillar will be released over time in different materials and finishes, using the various techniques of 3D printing, allowing the end customer to have continuous modifications and customizations.
The bracelet is composed by 24 elements which are unique and numbered and connected by a simple elastic thread that can be removed and replaced, giving the possibility of endless recombinations.…
AutoCAD specifically)
There has been 57 new items on their forums in the same 24 hr period.
If David hasn't replied to this in the morning I will bring it to his attention.
…
onsidered period.
Even if the end of July for the mediterranean climate is not the best period to perform an adaptive comfort analysis (it's just a pretest to define a LB model) I want to refine the Adaptive comfort Chart (AC) by changing the external air temperature data imported from the .epw file with that of monitored data as reported here below:
Where the monitored ext air temperature are in this form (green panel below):
I have used the comfortPar component to set the following parameters:
Adaptive chart as defined by EN 15251
90% of occupants comfortable
the prevailing outdoor temperature from a weighted running mean of the last week
fully conditioned space (even if it is not properly in line with AC as already discussed)
The question is this: the AC component could correctly apply the code below if there is only a list of external temperature data for a restricted period (without indication about the limits of this period) and not for an entire year?
else: #Calculate a running mean temperature. alpha = 0.8 divisor = 1 + alpha + math.pow(alpha,2) + math.pow(alpha,3) + math.pow(alpha,4) + math.pow(alpha,5) dividend = (sum(_prevailingOutdoorTemp[-24:-1] + [_prevailingOutdoorTemp[-1]])/24) + (alpha*(sum(_prevailingOutdoorTemp[-48:-24])/24)) + (math.pow(alpha,2)*(sum(_prevailingOutdoorTemp[-72:-48])/24)) + (math.pow(alpha,3)*(sum(_prevailingOutdoorTemp[-96:-72])/24)) + (math.pow(alpha,4)*(sum(_prevailingOutdoorTemp[-120:-96])/24)) + (math.pow(alpha,5)*(sum(_prevailingOutdoorTemp[-144:-120])/24)) startingTemp = dividend/divisor if startingTemp < 10: coldTimes.append(0) outdoorTemp = _prevailingOutdoorTemp[7:] startingMean = sum(outdoorTemp[:24])/24 dailyRunMeans = [startingTemp] dailyMeans = [startingMean] prevailTemp.extend(duplicateData([startingTemp], 24)) startHour = 24
…
master bedroom are side by side). From there the floor plans that are created are all unique. The list of controls is quite long but here are a few; floor to floor, windows and spacing, roof height, roof pitch, number of dormers, ridge direction, front door, garage door, farming spacing (i.e. 16 in oc, 24 in oc....), framing member size, general typology (square, L shape, shotgun...).…
ocessed once Grasshopper is done with whatever it's doing now.
3) Grasshopper tells the Slider object that the mouse moved and the slider works out the new value as implied by the new cursor position.
4) The slider then expires itself and its dependencies ([VB Step 1] in this case, but there can be any number of dependent objects).
5) When [VB Step 1] is expired by the slider, it will in turn expire its dependencies (VB Step 2), and so on, recursively until all indirect dependencies of the slider have been expired.
6) When the expiration shockwave has subsided, runtime control is returned to the slider object, which tells the parent document that stuff has changed and that a new solution is much sought after.
7) The Document class then iterates over all its objects (they are stored in View order, not from left to right), solving each one in turn. (Assuming the object needs solving, but since in your example ALL objects will be expired by a slider change, I shall assume that here).
8) It's hard to tell which object will get triggered first. You'd have to superimpose them in order to see which one is visually the bottom-most object, but let's assume for purposes of completeness that it's the [VB Step 1] object which is solved first.
9) [VB Step 1] is triggered by the document, which causes it to collect all the input data.
10) The input parameter [x] is asked to collect all its data, which in turn will trigger the Slider to solve itself (it got expired in step 4 remember?). This is not a tricky operation, it merely copies the slider value into the slider data structure and shouts "DONE!".
11) [x] then collects the number, stores it into its own data structure and returns priority to the [VB Step 1] object.
12) [VB Step 1] now has sufficient data to get started, so it will trigger the script inside of it. When the script completes, the component is all ready and it will tell the parent document it can move on to the next object (the iteration loop from step 7).
13) Let us assume that the slider object is next on the list, but since it has already been solved (it was solved because [VB Step 1] needed the value) it can be skipped right away, which leaves us with the last object in the document which is still unsolved.
14) [VB Step 2] will be triggered by the document in very much the same way as [VB Step 1] was triggered in step 9. It will also start by collecting all input data.
15) Since all the input data for [VB Step 2] is either defined locally or provided by an object which has already been solved, this process is now swift and simple.
16) Upon collecting all data and running the user script, the component will surrender priority and the document becomes active again.
17) The document triggers a redraw of the Grasshopper Canvas and the Rhino viewports and then surrenders priority again and so on and so forth all the way up the hierarchy until Grasshopper becomes idle again.
[end boring]
Pretty involved for a small 3-component setup, but there you have it.
To answer somewhat more directly your questions:
- The order in which objects are solved is the same as the order in which they are drawn. This is only the case at present, this behaviour may change in the future.
- Adding a delay will not solve anything, since the execution of all components is serial, not parallel. Adding a delay simply means putting everything on hold for N milliseconds.
- [VB Step 1] MUST be solved prior to [VB Step 2] because otherwise there'd be no data to travel from [GO] to [Activate]. The only tricky part here is that sometimes [VB Step 1] will be solved as part of the process of [VB Step 2], while at other times it may be solved purely on its own merits. This should not make a difference to you as it does not affect the order in which your scripts are called.
--
The Man from Scene 24…
Added by David Rutten at 4:43pm on December 10, 2009
e 48. I want to join both curves.
This is the 3d: https://gyazo.com/6317bf58cbfe7d418ebfcc06f7ae7e3e
This is what I want to achieve (black lines): https://gyazo.com/52a652dd9074ca5ac62dba6caf526edc
Basically, its the Beijing Olympis Stadium's structure.
Sorry if it's not well explained, tell me if you don't understand anything.
Thanks in advance!…
cy of design communication and the control of information-flow are as important as the creativity of ideas. In response to the concurrent digital evolution emerging in the architectural industry world-wide, the Faculty of Architecture at The University of Hong Kong will host a two week intensive summer program named Digital Practice.Led by professors from The University of Hong Kong, as well as invited practitioners with expertise in practice of cutting edge digital techniques, the program offers participants opportunities to experience applications of computational tools during different stages of an architectural project, i.e. concept design, form finding and optimization, delivery, management and communication of design information under the team-based working environment. By learning advanced computational techniques through case studies in the context of Hong Kong, participants are expected to go beyond the conventional perception of technology, considering users and tools as a feedback-based entity instead of a dichotomy. The program, which is taught in English, includes a series of evening lectures related delivered by teaching staff and invited local architects.對於高品質的建築專案,創意之外,專案過程中高效的設計資訊管理和交流成為項目設計深化和實施必不可少的環節。今天,數字化技術不但改變了建築師的繪圖工具,影響了設計的過程,而且提供了工程建造和管理實施的更有效、更高效的手段。針對建築的數位化演進,香港大學建築學院將於2011年暑假期間,在香港大學建築學院舉辦“數位化實踐”國際研習班。在香港大學建築學院教授及有著相關豐富經驗的外聘實踐建築師的指導下,學員將有機會體驗在專案的不同階段(如概念設計、設計形式的生成、優化,設計資訊的管理和交流),如何有效地應用各種運算智慧化技術(從設計的數位化生成和建築資訊類比到物理模型),提升設計實施的品質,增加設計團隊對於方案的控制。我們將挑戰對於“技術”的傳統認知,即相對於使用者它不僅是工具,更是與使用者互動的媒介,二者形成一個有機的合體。研習班期間會安排系列講座,展現數位化技術在實踐工程中的廣泛應用。…
input....panel to the right is the displaying headers of the results).
The analysis period is going in properly formatted to the EP component. I suspect maybe the idf file is being written this field incorrectly.
I'm attaching my gh file, you can find the EP components at the bottom grouped in green.
best,
Mauricio…