as the coordinates to move the objects vs the global system they are on by default.
If I could plug my new planes into the xyz component that might solve my problem but this is clearly not possible.
any help would be greatly appreciated...…
m b1 As Brep = Nothing
If (heights(b) > heights(b+1)) Then
b0 = breps(b+1)
b1 = breps(b)
Else
b0 = breps(b)
b1 = breps(b+1)
End If
Dim bDiff As Brep() = Brep.CreateBooleanDifference(b0, b1, 0.1)
If (bDiff IsNot Nothing) AndAlso (bDiff.Length > 0) Then
breps(b) = bDiff(0)
End If
--
David Rutten
david@mcneel.com
Poprad, Slovakia…
Added by David Rutten at 7:32am on October 16, 2012
nt B2[i] so B1[i]<=0 means no new connections allowed for point i ,so point i is deleted from B1, B2 updated accordingly.
Initialization:
B1: max number of connections x number of points
B2: all the points
B3: nothing (well null or something, need to create the branch)
Algo:
Get first point in B2, get his allowed number of connections N in B1, find N closest points in B2, create lines in B3, update B2 accordingly. Erase points with max connections (including the first point)
Next
Stop when no points available
At end of loop, B3 stores the created lines.
…
سلام آقای جان بیلی کاوه اشکوه هستم اپراتور سی ان سی از ایران وطراح دکوراسیون داخلی اگر ممکن هستش فایل اصلی میزcosinosa baram mail konid adressmail man hast
(kavehoshkooh2290@gmail.com)بسیار متشکرم
Added by kavehoshkooh at 3:25pm on September 11, 2015