onnected to 10 points --> 3 of 10 Lines have an intersection with the brep
point "1" is connected to 10 points --> 5 of 10 Lines have an intersection with the brep
point "2" is connected to 10 points --> 2 of 10 Lines have an intersection with the brep
I actually got this information but as you can see the algorithm become pretty long…
Added by Robert Megel at 12:46pm on November 1, 2012
the slider? They could be less or more? Actually I have data coming from changing values of a slider but defininig 10 configuration and I want to stream the 10 configuration data on 10 different sheet of the same file (i guess it is possible with your tool). I need to associate a different sheet number from 1 to 10 to each configuration and input it the Sheet input right? Thank you.
Francesco
…
and B inputs. This gives the odd results. I replaced the B Panel with an integer slider and the Pow component works properly.
When I use a Panel for B I get the following results (A panel is 10):
B=0 R=10
B=1 R=100
B=2 R=10,000
B=3 R=100,000,000…
Added by Steven Hall at 7:38pm on September 7, 2010
1
condition: largest number<max length
then the packing would look something like this:
1 |4 |5 |7 |2
9 |6 |5 |3 |2
|5
|1
sums|10|10|10|10|10 => 100% efficiency
And the algorithm is:
1.Place first number(x=1)
2.Calculate the rest(R) in this row(10-1=9)
3.Search for closest x <= than R
3.1 If x=R -> place that number -> end of cycle
3.2 If x<=R -> place that number -> return to 2.
3.3 If x=null -> end of cycle
Something like this.
Can this be classified as brute force?
…
Added by Artyom Maxim at 11:08am on March 19, 2013