Fernando,
The problem is that for example in your definition, it gives 16 curves instead of 20!!! it always gives wrong numbers! I don't know what's the problem!
M
These are normal tree manipulations or ways to modify lists.
A way to get started is to read the Grasshopper primer, chapter 8, page 36 to 52.
- Giulio _____________ giulio@mcneel.com McNeel Europe
byte-accuracy red, green, blue channels) = 27 bytes. More likely 28 bytes as colours are probably stored as 32-bit integers, allowing for an unused alpha channel.
28 * 800,000 equals roughly 22 megabytes, which is way down from 9 gigabytes. That's a 400 fold memory overhead, which is pretty hefty.
Grasshopper stores points as instances of classes, so on 64-bit systems it actually takes 64+64+3*8 = 152 bytes per point*, which adds up to 122MB, still way less than 9GB. It would be interesting to know where all the memory goes...
* Grasshopper points also store reference data, in case they come from the Rhino document. This data will not exist, but even so it will require 64-bits of storage.…
Added by David Rutten at 4:13pm on December 11, 2014
This is another shot of the jig we built to make each of the 10 upper truss sections. it's easier to see here the 36 degree angle we set the jig to in order to make all of the tines match
perimeter as possible. The problem (that I think can be solved with a loop, I just don't know how) Is that I only can choose the modules that are in the top. I thought I should use galapagos to choose which module I should remove. But the problem is that the list of modules that I can choose change everytime I remove one. I've tested hoopsnake and octopus loop but I couldn't make it happen.
Any ideas?…
ectural context.
We will work with 5 projects that meet the conditions to be re-thinked nowadays in parametrical terms. { FOA : World Trade Center / MAD OFFICE : 800M Tower / TOYO ITO : Relaxation Park / FOSTER & PARTNERS : Gherkin Tower / FREE : Soumaya Museum }
We will produce dynamic objects defined by parameters and modified in realtime.
We will learn to discretize, facet and panel in a non homogeneous way.
We will work with restrictions to determine our shapes, obtaining unpredictable results.
And we will take the control of what we produce : by measuring , visualizing and optimizing our parametric forms.
2 Groups / 30 students max :
Thursdays : 25 Apr ,02 ,09 ,16 & 23 May
Saturdays : 27 Apr ,04 ,11, 18 & 25 May
Fee : 73 € / student…
Added by Carlos Bañón at 10:26am on April 18, 2013