3 of each ring.
The problem is that the index is a mess and the pieces 1 are not in the same position in each ring.
Atatched is the definition
Thank you
Julia…
Added by julia almeida at 2:23pm on November 27, 2011
tretch ... is ... well ... enable it and observe where the transformation starts.
BTW: For David: is it me or the Following capability is down? (stopped since April 15).
best
…
ve it) rotated by 15, group 3 ( above group 2) rotated 15 degrees relative to group 2.
The distance between the cubes, the number of cubes on each contour must remain as shown in attached gh file.
I understand we can achieve this with series or with shift, however am unable to figure out where to plug it in to achieve the desired result.
Please guide.
Many Thanks…
des]. I have 5-variables with 4 options each (a total of 4x4x4x4x4 = 1024 variations):
Height: 6,7,8 & 9 ft
Depth inside: 1, 2, 3 & 4 ft
Depth outside: 1, 2, 3 & 4 ft
Rotation outside: 0, 15, 30 & 45 degree
Rotation inside: 0, 15, 30 & 45 degree
I do not see convergence yet (see attached). The last combination of variables say 9-ft high, 4-ft deep (inside & outside) and 0-deg rotation (horizontal) inside and outside. Is this the optimized value of the light shelf parameters for the best illumination level at the sensor plane for that specific place, time and date?
Shamim.…
Added by Shamim Javed at 1:01pm on November 3, 2013
he sunPath component works. For example if you want to simulate the hours from 8 to 16 it means you want 8 hours from 8 to 9, from 9 to 10,.... from 15 to 16 (8 hours duration period) so you get from the sunPath component (using default timeStep 1) the 9 sun position/vectors 8 9 10 11 12 13 14 15 16 (in the image the yellow suns). The things is that if you ask for a smaller timeStep for example 3 = 20 mins then the additional sun position (in the image the orange suns) are added also after the time limit of h16 so probably when you don't want/need. I understand that when you input a time period there is the ambiguity if the hours are the just 9 (the 9 inputs) or the 8 hours included between pairs of hours, but I would make in a way that it is possible to chose if the extra timeStep after the last hour are added or not. Thank you for your comments.
…
0,
I want to move everything in {2} up 5 and 10 and 15,
Any ideas. I have been trying using the series component to create the right data structure but somehow its not working and i am sure there is a simple way?
Do i have to repeat the data so that the number of transform data matches the input list or is there a way to simply apply the transformation to everything in {0}{1} and {2} respectively depending on its structure ??
Hopefully this makes sense? I am not really sure but is it a job for stream - i cant understand why i cant get it to work. Sorry i am sure this is covered in the forums, i have been looking but cant anything which helps specifically.
Many thanks
Chris…
cy of design communication and the control of information-flow are as important as the creativity of ideas. In response to the concurrent digital evolution emerging in the architectural industry world-wide, the Faculty of Architecture at The University of Hong Kong will host a two week intensive summer program named Digital Practice.Led by professors from The University of Hong Kong, as well as invited practitioners with expertise in practice of cutting edge digital techniques, the program offers participants opportunities to experience applications of computational tools during different stages of an architectural project, i.e. concept design, form finding and optimization, delivery, management and communication of design information under the team-based working environment. By learning advanced computational techniques through case studies in the context of Hong Kong, participants are expected to go beyond the conventional perception of technology, considering users and tools as a feedback-based entity instead of a dichotomy. The program, which is taught in English, includes a series of evening lectures related delivered by teaching staff and invited local architects.對於高品質的建築專案,創意之外,專案過程中高效的設計資訊管理和交流成為項目設計深化和實施必不可少的環節。今天,數字化技術不但改變了建築師的繪圖工具,影響了設計的過程,而且提供了工程建造和管理實施的更有效、更高效的手段。針對建築的數位化演進,香港大學建築學院將於2011年暑假期間,在香港大學建築學院舉辦“數位化實踐”國際研習班。在香港大學建築學院教授及有著相關豐富經驗的外聘實踐建築師的指導下,學員將有機會體驗在專案的不同階段(如概念設計、設計形式的生成、優化,設計資訊的管理和交流),如何有效地應用各種運算智慧化技術(從設計的數位化生成和建築資訊類比到物理模型),提升設計實施的品質,增加設計團隊對於方案的控制。我們將挑戰對於“技術”的傳統認知,即相對於使用者它不僅是工具,更是與使用者互動的媒介,二者形成一個有機的合體。研習班期間會安排系列講座,展現數位化技術在實踐工程中的廣泛應用。…
as follows.
We have a grid which consists of a collection of columns, where each column consists of a list of points. You said flattening is out of the question, so we need to cull items from each list individually.
Let's say our culling pattern is KDDDKDD (repeat as needed). K = Keep, D = Ditch. If a column contains 18 points, the pattern needs to be repeated until it is 18 items long. In this case:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
K D D D K D D K D D D K D D K D D D
We can now cull each column, but they will all be culled in the same way. By shifting the pattern one more index for each column, we can cycle the culling.
The fix incidentally is to Shift the pattern PRIOR to repeating it. Then it works as expected:
--
David Rutten
david@mcneel.com
Tirol, Austria…
Added by David Rutten at 2:49pm on October 2, 2013
NONE, in SIZING:PARAMETERS". I'm not sure of where to start in troubleshooting this. I've attached the file.
Thank you,
See the errors and warnings below:
{0;0;0}
0. Current document units is in Meters
1. Conversion to Meters will be applied = 1.000
2. [1 of 8] Writing simulation parameters...
3. [2 of 8] Writing context surfaces...
4. [2 of 8] Writing context surfaces...
5. [3 of 8] Writing geometry...
6. [4 of 8] Writing Electric Load Center - Generator specifications ...
7. [5 of 8] Writing materials and constructions...
8. [6 of 8] Writing schedules...
9. [7 of 8] Writing loads and ideal air system...
10. [8 of 8] Writing outputs...
11. ...
... idf file is successfully written to : R:\Green\SuRG\Building_Performance_Analysis\2016_analysis_studies\Energy_Analysis_Comparison\Honeybee_+_Ladybug\tutorial01\EnergyPlus\tutorial01.idf
12.
13. Analysis is running!...
14. ...
...
Done! Read below for errors and warnings:
15.
16. Program Version,EnergyPlus, Version 8.5.0-c87e61b44b, YMD=2016.10.31 11:39,IDD_Version 8.5.0
17.
18. ************* IDF Context for following error/warning message:
19.
20. ************* Note -- lines truncated at 300 characters, if necessary...
21.
22. ************* 24 Sizing:Parameters,
23.
24. ************* Only last 1 lines before error line shown.....
25.
26. ************* 25 None, !- Heating Sizing Factor
27.
28. ** Severe ** IP: IDF line~25 Invalid Number in Numeric Field#1 (Heating Sizing Factor), value=NONE, in SIZING:PARAMETERS
29.
30. ** Warning ** IP: Note -- Some missing fields have been filled with defaults. See the audit output file for details.
31.
32. ** ~~~ ** Possible Invalid Numerics or other problems
33.
34. ** Fatal ** IP: Errors occurred on processing IDF file. Preceding condition(s) cause termination.
35.
36. ...Summary of Errors that led to program termination:
37.
38. ..... Reference severe error count=1
39.
40. ..... Last severe error=IP: IDF line~
, value=NONE, in SIZING:PARAMETERS
41.
42. ************* Warning: Node connection errors not checked - most system input has not been read (see previous warning).
43.
44. ************* Fatal error -- final processing. Program exited before simulations began. See previous error messages.
45.
46. ************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
47.
48. ************* EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors.
49.
50. ************* EnergyPlus Terminated--Fatal Error Detected. 1 Warning; 1 Severe Errors; Elapsed Time=00hr 00min 9.34sec