and Ronnie of StudioMode and David Fano of DesignReform will also be attending.
RSVP has been closed on this event. Space is limited to 50 people. Please attend if you do RSVP.
Agenda -
12:00-1:00 Arrival, informal discussion
1:00 - 1:15 Introductions
1:15 - 2:00 Project presentation 1 (30 minutes + 15 min QA) - David Lee - Clemson - 3D pattern environments using volumetric proxies.
2:00 - 2:45 Project Presentation 2 (30 minutes + 15 min QA) - P. Casey Mahon - Organic Abstractions (30 minutes + 15 min QA)
2:45 - 3:45 David Rutten - New work in GH (30 min QA)
3:45 - 4:30 Sameer Kumar AIA - KPF - Project presentation 3 (30 minutes + 15 min QA)
4:30 - 5:15 Chris Wilkins - Clemson - Urban Renewal and parametric urban development studies in Grasshopper.
5:15 - 6:00 David Rutten - Scripting in GH (15 min QA)
After 6:00 conversations may move down the street for more discussion.
If you would like to present your project at the Cloud please email: scottd@mcneel.com…
cture, Rhino treats them as a single flat list. For example a surface can have 10 rows and 6 columns of control-points, resulting in a list of 60 points.
But 10 times 6 isn't the only way to get to 60. If you want to make a surface out of a list of 60 points, you'll also have to tell Rhino how those 60 points should be interpreted in terms of a grid. It could be 2*30, 3*20, 4*15, 5*12, 6*10, and all of the aforementioned products the other way around.
Sometimes there's only one way for a number of points to fit into a rectangular grid. For example if you provide 49 points, then 7*7 is the only way to make it work, but these cases are rare so we always demand you give us all the information required to actually make a rectangular grid of control-points from a linear collection.
As for "Why is it, sometimes we need to attach additional value into it?", this is usually because when you divide a domain or a curve into N segments, you end up with N+1 points. For example take the domain {0 to 5}, and divide it into 5 equal subdomains. You end up with {0 to 1}, {1 to 2}, {2 to 3}, {3 to 4} and {4 to 5}. However there are six numbers that mark the transitions between these domains 0, 1, 2, 3, 4 and 5. This is why you often have to add 1 to the UCount, because the number that controls the UCount often results in N+1 actual points.…
Added by David Rutten at 8:30am on December 25, 2014
a seed, and instead creating a pattern where each color has a seed/control slider for each row? For example, row 1: brown 2, tan 6, yellow 7, purple 3, repeat. row 2: brown 6, tan 1, yellow 4, purple 10, repeat. row 3: yellow 5, purple 1, brown 3, tan 10, repeat. row 4: purple 2, brown 7, tan 3, yellow 4, repeat. Then repeat that sequence up the wall? For each color, the number in the sequence should be adjustable.
Thank you again for your help!…
another example could be:
index 3 value 6
index 4 value 6
index 5 value 6
flipped and branched:
branch 6 index 0 value 3
branch 6 index 1 value 4
branch 6 index 2 value 5
Added by Ante Ljubas at 12:50pm on October 22, 2010
rated by "<" symbols. Examples: "2<10", "2<4<10", "Pow(2, 1)<5*Sin(3)<10".
The entered text contains 2 or 3 segments separated by two or more consecutive dots. Examples "2..10", "2..4..10", "Pow(2, 1)....5*Sin(3)..10".
If only two segments are provided, then the initial value will be the same as the minimum value. If a bounds number or a default value is written as a simple number, then the number of decimal places will be harvested. I.e. "2..4..10" is not the same as "2..4..10.00" as the former will result in an integer slider and the latter in a slider with two decimal places.
--
David Rutten
david@mcneel.com
Poprad, Slovakia…
Added by David Rutten at 10:08am on February 15, 2013
o type in the values less than -1 x 10^-6 in "Floating point value", can be bypassed by multiplying this value with another -1 x 10^-6. That way I will get -1 x 10^-12, right? And so on, and so on?
What is the minimum "Floating point value" Panel (String) can take?
Thank you.…