erations, is not it?
This is what I finally want and how I plan to do it:
In the starting tree, points are listed accordingly to the (11) 4-side-panels they belong to. I need to do a tree where each of the 11 lists contains not the points composing the panels but the points code of the points composing the panels. the point code is the number in the flattened list that refers to the points (like, panel 1 is made of points n 0,1,4,18, and so on). To do this, I suppose that I will use my tree of 11 lists of 33 true-false values, and apply it to cull 11 times a series of numbers from 0 to 32. I ll post it if it works!…
掌握编程过程中遇到的思路方面和技术方面的问题. 内容包括以下几个方面:
反向逻辑思维能力的培养;
建立清晰的编程逻辑思维能力;
GH 的程序设计理念;
并行数据结构深入理解和控制.
Grasshopper course of McNeel Asia focus on the cultivation of students flexible use of programming techniques, the ability to solve practical problems. Our course deep into the whole process of programming, from programming thinking model, the components principle to usage details do detailed explanation, help students complete mastery programming encountered in the process of thinking and technical aspects, include the following content:
Ability of reverse logical thinking;
Establishment of clear programming logical thinking ability;
The program design concept of Grasshopper;
Understanding parallel data tree structure and how to control it.
更多详细内容... More details…
授课讲师 Instructor 课程由Grasshopper原厂McNeel公司在中国地区的两位 Rhino 原厂技术推广工程师 – Dixon、Jessesn联合授课。课程结束后对达到授课预定目标的学员颁发唯一由Grasshopper原厂认证的结业证书.
Dixon & Jessesn, McNeel Asia Support engineer, by the end of course student who achieve the intended target will get the authentication certificate from McNeel Asia.
课程报名 Register this course 课程即日开始报名, 开课一周前停止报名, 名额满提前报名结束. This course begin to sign up, stop sign up a week ago, with the quota ahead over.
在线报名参加课程...
Sign up to this course…
课程日期 Schedule 7/15-7/20 Beijing 北京 7/26-7/31 Shanghai 上海 7/07-7/12 Shenzhen 深圳
课程范例演示 Samples of Grasshopper course demo
Note: pls follow below comments by Jessesn to see the samples…
I extract the first two with a "Redim Preserve t(1)" command.
In the first case, the redim is correct, Line 7 = Line 2 and Line 8 = Line 3. It just kept the first two values like it is supposed to be.
But, for the second curve starting Line 9, some t values are messed up after the Redim. Line 16 = Line 17 despite Line 11 was different from Line 12. That's what is creating a problem later in the Split.
Weird.
…
e range of materials, including heavy-duty fabrics. They offer a range of embroidery machines that cater to different needs and budgets.best embroidery machine for custom designs…
ror "nighttime"
how could that be - must be in the weather file i assume - is there anyway to fix this ?
suncalc.net gives me the following
00:00—02:17 — night
02:17—03:43 — astronomical twilight03:43—04:39 — nautical twilight04:39—05:19 — civil twilight05:19—05:23 — sunrise05:23—21:11 — daylight21:11—21:15 — sunset21:15—21:55 — civil twilight21:55—22:51 — nautical twilight22:51—00:17 — astronomical twilight00:17—00:00 — night
plz help - thank you !!!
…
7 -18.2
8 5.02
9 12.4
10 18.1
11 7.01
12 5.11
13 2.35
this data is waveform data.
i want to pick out only climax(for example in upper data, number 1 and 10) from this data.
i have this problem...that is, i do not know to do what.
i think my English is strange...so you are difficult to understanding my question.…
nique name like in your example {0;0},{0;1},{0;2},{0;3} where each path contains 11 elements(curves,points,values,etc)
so if you want to restructure the structure first right click on path mapper and take create null mapping which reads your current path structure into the component
after that you can additional write on the left side to the existing path (i) as variable for the elements and then on the right side type in the structure you want to achieve
maybe {A;i}(B) so after that you have 11 paths where each have 3 elements
hope that helps…