Hi
I'm trying to write a simple script to offset a curve muliptle times (using a 'for loop') but I don't know the vb dotNet syntax. I'm sure lines 84, 88 & 89 are wrong. Any ideas.
Thanks. P
Added by Paul Wintour at 8:25am on September 28, 2010
nologically label them (there are currently 65 points and this is labelled as in the file i've attached). However, what i'm actually after is to reformat these points into an x and y style grid.(a1, a2, a3, a4, a5)(b1, b2, b3, b4, b5)(c1, c2, c3, c4, c5)(d1, d2, d3, d4, d5) etc.Any ideas/help how this can be made possible would be great.Thanks in advance…
he code within a limited number of turns. I suggest you check 양방하는법 and learn more interesting things about games. The game is not only challenging and fun, but it also helps to improve cognitive skills such as critical thinking, problem-solving, and pattern recognition. Mastermind has stood the test of time and remains a beloved game for all ages.…
Added by MichaelD0112 at 12:25am on April 10, 2023
omponent that increases in the x-axis (example below).
A1 A2 A3 A4 A5 etc...B1 B2 B3 B4 B5 etc...C1 C2 C3 C4 C5 etc...D1 D2 D3 D4 D5 etc...
This is as far as I've gotten:
I have collected my points on the grid into a "List Length" component and input that into a "Series" which input into a "Function" with the expression Format("A{0}",x). The result labeling resembles the example below.
A1 A2 A3 A4 A5
A6 A7 A8 A9 A10
A11 A12 A13 A14 A15 etc...
Any help is appreciated.
Thank you in advance.…