blinds be (B1,B2..B5). Then the geometry for the five iterations will be ((A+B1), (A+B2)...(A+B5)).
And assume that you are measuring illuminance at four points inside the room (x1,x2,x3,x4) and one point outside the room(y1).
The way Daysim works ( and should work as per the best of my understanding) is that for each setting of the blind (ie. B1,B2,..B5), a separate value of (x1,x2,x3,x4) gets calculated through the Daylight Coefficient Method. So let's say you have illuminance thresholds of (p,q,r,s,t) corresponding to (B1,B2,..B5). What the shade-control algorithm does is that it compares the illuminance at y1 with your threshold of (p,q,..t) and then chooses a value of (x1,x,2,x3,x4) on basis of that. So, when we repeat this process for (365x24=)8760 hours , we end up with a value of a shade setting for each hour which was set on basis of your threshold illuminance values.
I would have gladly answered your question on HB itself, however, I usually work with Daysim directly through commandline.
(BTW, if you are interested in reading more about Daysim google Christoph Reinhart's dissertation on the subject, along with some papers by Zack Rogers).…
7,8. It would plot on the line of the 20%, 20%, 70%, 80% of the length of the line. I'm not looking for a way to divide the curve by 2 and then by 2,not steps. So I would have two points at 20%. I hope this is clear.
Thanks,
Tom…
rotate back to zero degree (start position) then don't rotate, then rotate to -80 degree, then back to zero degree (start position) and stay there.
I hope the you can help me.
Thank you.
…