algorithmic modeling for Rhino
Hi all,
to evaluate the difference between an annual analysis in E+ with and without thermal history (warmup+sim) we tried to develop a way to overcome the LB-limits of the analysis period component (switching from h24 to h1). But still we can't make it run.
Is there a way to achieve an animated one-by-one hour E+simulation with an alternative analysisPeriod-construction?
Thanks in advance,
Tags:
Replies are closed for this discussion.
Daniel,
I believe that EnergyPlus requires a minimum of 1 warmup day and, if the warmup conditions do not converge to a stable value in the warmup period, E+ gives you a severe error to tell you that you simulation is probably wrong. That is why we write the default values in if you put in warmup days that are <= 0.
I haven't checked the E+ Input/Output reference enough to know if there is a way to plug in custom conditions for the warmup period:
http://bigladdersoftware.com/epx/docs/8-0/input-output-reference/
If you find something in there that sounds like it will do what you want, let us know and I can try to implement it in Honeybee.
I am not sure which attachment you are referring to in your most recent post.
-Chris
Welcome to
Grasshopper
Added by Parametric House 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
© 2024 Created by Scott Davidson. Powered by