algorithmic modeling for Rhino
Hello,
Please correct me if I am wrong but currently, on the merge component, one needs to disconnect and reconnect wires to change the order of inputs.
What if one could click on an input and move it up or down to change the order? So D2 could become D1 just by clicking on D2 and moving it up.
Would that help anyone else?
Many thanks,
Arthur
Tags:
I was talking about this some time ago in a post. My idea was a little bit more hardcore: circular nodes with moving inputs and outputs (you will be able to move input&output around the component). I was thinking about this because is not very comfortable to always make definitions from left to right (specially in the big ones).
Your idea could be a nice and fast way to improve some flexibility in component positioning.
Thanks Angel! That sounds quite interresting, could be v.2. of this variation, slightly more complex. Actually it could also work for components like `4 edges surface` or `sweep2` too.
Welcome to
Grasshopper
© 2026 Created by Scott Davidson.
Powered by