algorithmic modeling for Rhino
I have a load points which I have store, because I have to edit them manually later on.
I write them to excel, but after I edit one point when updates the excel list in the system almost freeze and I have to wait a minute or more until I can work again.
I though a solution can be that I store the list in data recorder and I write it to excel when all the point are finished. ( The points I have to edit are random, and sometimes I have to edit one point more than onve)
It means I have to edit the list and store it and adir again and so on.
I guess, it is a kind of recursive process...
I wonder can I speed up the process with data recorder?
Tags:
Welcome to
Grasshopper
Added by morteza khorsand 0 Comments 0 Likes
Added by Parametric House 0 Comments 0 Likes
Added by morteza khorsand 0 Comments 0 Likes
Added by morteza khorsand 0 Comments 0 Likes
© 2024 Created by Scott Davidson. Powered by